1 00:00:00,000 --> 00:00:22,950 foreign 2 00:00:26,550 --> 00:00:24,870 in late october nasa headquarters 3 00:00:29,109 --> 00:00:26,560 directed marshall to terminate the 4 00:00:31,990 --> 00:00:29,119 saturn one program following conclusion 5 00:00:34,310 --> 00:00:32,000 of the ten flight vehicle r d program 6 00:00:36,790 --> 00:00:34,320 this action eliminated four operational 7 00:00:39,670 --> 00:00:36,800 vehicles plus two spare vehicles 8 00:00:41,990 --> 00:00:39,680 deleting all saturn one manned flights 9 00:00:44,389 --> 00:00:42,000 prime hardware contracts for operational 10 00:00:46,549 --> 00:00:44,399 vehicles have been canceled hardware on 11 00:00:51,190 --> 00:00:46,559 hand will be used when possible on the 12 00:00:53,110 --> 00:00:51,200 boosters for sa-201 and 202. 13 00:00:54,950 --> 00:00:53,120 nasa headquarters also approved 14 00:00:58,150 --> 00:00:54,960 launching of the remaining saturn 1 15 00:01:01,110 --> 00:00:58,160 vehicles from launch complex 37b and 16 00:01:03,590 --> 00:01:01,120 modifying launch complex 34 for initial 17 00:01:06,789 --> 00:01:03,600 saturn 1b launches 18 00:01:08,710 --> 00:01:06,799 at cape kennedy early in october the s45 19 00:01:11,990 --> 00:01:08,720 stage was mated with the previously 20 00:01:14,070 --> 00:01:12,000 erected sa-5 booster the instrument unit 21 00:01:15,830 --> 00:01:14,080 and the payload 22 00:01:18,230 --> 00:01:15,840 pre-launch checkout of the vehicle 23 00:01:20,230 --> 00:01:18,240 continued as scheduled until november 24 00:01:23,670 --> 00:01:20,240 when an explosion in launch complex 25 00:01:26,310 --> 00:01:23,680 37b's gaseous hydrogen vent line caused 26 00:01:28,070 --> 00:01:26,320 a delay of one week 27 00:01:30,149 --> 00:01:28,080 other technical problems encountered 28 00:01:32,230 --> 00:01:30,159 during testing were quickly resolved 29 00:01:34,469 --> 00:01:32,240 until cracked sleeves were discovered in 30 00:01:35,670 --> 00:01:34,479 the s1 stage high pressure pneumatic 31 00:01:37,429 --> 00:01:35,680 lines 32 00:01:40,230 --> 00:01:37,439 these sleeves which had cracked because 33 00:01:42,310 --> 00:01:40,240 of stress corrosion had to be replaced 34 00:01:44,310 --> 00:01:42,320 this requirement forced rescheduling the 35 00:01:45,990 --> 00:01:44,320 launch from late december until early 36 00:01:48,149 --> 00:01:46,000 1964. 37 00:01:50,870 --> 00:01:48,159 to prevent reoccurrence of the problem 38 00:01:52,950 --> 00:01:50,880 msfc issued new specifications on heat 39 00:01:56,469 --> 00:01:52,960 treating and began installing new 40 00:01:58,069 --> 00:01:56,479 sleeves on s15 and all subsequent s1 41 00:01:59,910 --> 00:01:58,079 stages 42 00:02:01,670 --> 00:01:59,920 marshall and douglas have taken 43 00:02:05,030 --> 00:02:01,680 advantage of the delay to perform 44 00:02:06,550 --> 00:02:05,040 additional testing on s45s cold helium 45 00:02:08,389 --> 00:02:06,560 sphere mountings 46 00:02:10,389 --> 00:02:08,399 following completion of these tests and 47 00:02:12,790 --> 00:02:10,399 the critical tubing replacements the 48 00:02:15,430 --> 00:02:12,800 simulated flight test will be repeated 49 00:02:17,589 --> 00:02:15,440 and the vehicle launched 50 00:02:19,830 --> 00:02:17,599 at marshall the flow of subsequent s1 51 00:02:22,070 --> 00:02:19,840 stages continued even though work on 52 00:02:24,150 --> 00:02:22,080 each stage is being interrupted to allow 53 00:02:25,830 --> 00:02:24,160 for tubing replacement 54 00:02:27,910 --> 00:02:25,840 booster post static checkout was 55 00:02:30,710 --> 00:02:27,920 completed for the sixth saturn flight 56 00:02:32,470 --> 00:02:30,720 vehicle sa-6 during november 57 00:02:34,630 --> 00:02:32,480 following completion of preparation for 58 00:02:37,030 --> 00:02:34,640 shipment the stage will be barged to 59 00:02:39,110 --> 00:02:37,040 cape kennedy early in the next quarter 60 00:02:41,589 --> 00:02:39,120 sa-6 will be the first vehicle to have 61 00:02:49,990 --> 00:02:41,599 an apollo boilerplate spacecraft as 62 00:02:54,150 --> 00:02:51,670 meanwhile the booster for the seventh 63 00:02:56,229 --> 00:02:54,160 flight vehicle sa-7 underwent two 64 00:02:59,270 --> 00:02:56,239 successful firings at marshall's test 65 00:03:02,710 --> 00:02:59,280 laboratory during october one for 35 66 00:03:05,110 --> 00:03:02,720 seconds the other for 145 seconds 67 00:03:06,869 --> 00:03:05,120 stage post static checkout delayed 68 00:03:09,589 --> 00:03:06,879 temporarily to allow for tubing 69 00:03:19,030 --> 00:03:09,599 modification is expected to be completed 70 00:03:23,670 --> 00:03:20,869 assembly of the booster for the eighth 71 00:03:27,350 --> 00:03:23,680 flight vehicle sa-9 was completed in 72 00:03:29,509 --> 00:03:27,360 october and pre-static checkout started 73 00:03:33,990 --> 00:03:29,519 static firing of the stage is presently 74 00:03:38,710 --> 00:03:37,110 at michoud on october 27th chrysler 75 00:03:42,390 --> 00:03:38,720 began checkout of the first 76 00:03:44,070 --> 00:03:42,400 industry-produced saturn one booster s18 77 00:03:46,229 --> 00:03:44,080 the functional checkout began in 78 00:03:48,869 --> 00:03:46,239 november mechanical systems were the 79 00:03:50,869 --> 00:03:48,879 first to be checked out 80 00:03:55,350 --> 00:03:50,879 pneumatic pressure lines and connections 81 00:03:59,110 --> 00:03:57,030 checkout completion is presently 82 00:04:01,030 --> 00:03:59,120 scheduled for march 83 00:04:05,030 --> 00:04:01,040 in april the stage will be shipped to 84 00:04:10,309 --> 00:04:07,990 assembly of s110 by chrysler continued 85 00:04:12,070 --> 00:04:10,319 at michoud during this quarter assembly 86 00:04:16,870 --> 00:04:12,080 completion and start of checkout is 87 00:04:22,069 --> 00:04:19,590 preparation of h1 engines for the stage 88 00:04:24,950 --> 00:04:22,079 continued on schedule two engines 89 00:04:27,749 --> 00:04:24,960 originally intended for s111 90 00:04:31,510 --> 00:04:27,759 will be used to replace s110 engines 91 00:04:33,749 --> 00:04:31,520 that developed thrust chamber leaks 92 00:04:36,950 --> 00:04:33,759 early in october the douglas aircraft 93 00:04:39,670 --> 00:04:36,960 company installed s46 in sacto test 94 00:04:42,550 --> 00:04:39,680 stand 2b and began preparations for 95 00:04:44,710 --> 00:04:42,560 acceptance testing on november 22nd a 96 00:04:48,469 --> 00:04:44,720 successful static firing was conducted 97 00:04:50,710 --> 00:04:48,479 for 460 seconds as planned post static 98 00:04:52,710 --> 00:04:50,720 checkout was completed in december 99 00:04:55,430 --> 00:04:52,720 presently necessary modifications are 100 00:04:58,390 --> 00:04:55,440 being performed including moog engine 101 00:05:02,629 --> 00:04:58,400 actuator retrofit the stage is scheduled 102 00:05:05,430 --> 00:05:02,639 for shipment to amr during february 103 00:05:09,029 --> 00:05:05,440 also at santa monica final assembly of 104 00:05:10,629 --> 00:05:09,039 s47 by douglas was completed in november 105 00:05:12,710 --> 00:05:10,639 checkout of the stage in the new 106 00:05:13,830 --> 00:05:12,720 vertical checkout facility is nearing 107 00:05:16,790 --> 00:05:13,840 completion 108 00:05:19,430 --> 00:05:16,800 s 47 is scheduled to arrive at sacto for 109 00:05:21,350 --> 00:05:19,440 acceptance testing early in february and 110 00:05:23,749 --> 00:05:21,360 will be installed in the stand a few 111 00:05:26,870 --> 00:05:23,759 days later 112 00:05:29,430 --> 00:05:26,880 the s49 stage located in douglas's 113 00:05:31,670 --> 00:05:29,440 assembly facility is approximately 20 114 00:05:37,270 --> 00:05:31,680 percent complete stage completion 115 00:05:41,749 --> 00:05:39,830 meanwhile s 4 8 was moved from the 116 00:05:43,990 --> 00:05:41,759 insulation installation room to the 117 00:05:46,870 --> 00:05:44,000 assembly area where miscellaneous pickup 118 00:05:48,310 --> 00:05:46,880 work was completed parts shortages which 119 00:05:51,110 --> 00:05:48,320 delayed moving the stage to the 120 00:05:55,430 --> 00:05:51,120 hydrostatic tower have been negated and 121 00:06:00,629 --> 00:05:57,590 during the latter portion of the quarter 122 00:06:02,950 --> 00:06:00,639 installation of s410 stage insulation at 123 00:06:05,110 --> 00:06:02,960 santa monica started immediately after 124 00:06:07,830 --> 00:06:05,120 completion of leak tests and tank 125 00:06:09,990 --> 00:06:07,840 calibration the stage is scheduled to be 126 00:06:12,629 --> 00:06:10,000 removed from the insulation installation 127 00:06:15,270 --> 00:06:12,639 room and be installed in the hydrostatic 128 00:06:18,469 --> 00:06:15,280 tower for additional leak checks in late 129 00:06:24,150 --> 00:06:21,189 at sacramento douglas buildup of the all 130 00:06:26,469 --> 00:06:24,160 systems s4 vehicle continued during this 131 00:06:30,230 --> 00:06:26,479 quarter static firings are scheduled to 132 00:06:33,430 --> 00:06:32,070 at marshall completion of functional 133 00:06:36,870 --> 00:06:33,440 checkout for 134 00:06:39,029 --> 00:06:36,880 6 was rescheduled for january 1964 to 135 00:06:41,110 --> 00:06:39,039 allow checkout of engineering changes 136 00:06:44,230 --> 00:06:41,120 incorporated during december 137 00:06:47,590 --> 00:06:44,240 siu6 and s16 will be shipped to cape 138 00:06:49,670 --> 00:06:47,600 kennedy in february 139 00:06:52,150 --> 00:06:49,680 martial assembly of the instrument unit 140 00:06:54,390 --> 00:06:52,160 for essay 7 is complete and final 141 00:06:59,510 --> 00:06:54,400 checkout is presently scheduled to begin 142 00:07:02,469 --> 00:06:59,520 at msfc on february 10 1964. 143 00:07:05,350 --> 00:07:02,479 structural fabrication of siu9 will be 144 00:07:07,909 --> 00:07:05,360 completed in january 1964 at marshall's 145 00:07:09,830 --> 00:07:07,919 manufacturing engineering laboratory the 146 00:07:14,550 --> 00:07:09,840 structure will then be stored until 147 00:07:16,469 --> 00:07:14,560 start of assembly march 2 1964. 148 00:07:18,950 --> 00:07:16,479 at marshall's test laboratory 149 00:07:21,350 --> 00:07:18,960 dynamic testing for the sa 6 and 7 150 00:07:24,150 --> 00:07:21,360 configuration using the saturn dynamic 151 00:07:25,830 --> 00:07:24,160 vehicle and the apollo boilerplate was 152 00:07:28,710 --> 00:07:25,840 successfully completed during this 153 00:07:31,350 --> 00:07:28,720 quarter later in february msfc has 154 00:07:34,550 --> 00:07:31,360 scheduled dynamic testing for the sa 9 155 00:07:37,909 --> 00:07:34,560 and 8 configuration sa 9 and 8 will 156 00:07:39,990 --> 00:07:37,919 carry micro meteoroid detection payloads 157 00:07:41,749 --> 00:07:40,000 preparations are underway at the dynamic 158 00:07:45,990 --> 00:07:41,759 test stand and are proceeding 159 00:07:50,870 --> 00:07:48,469 during this same period the s4 stage 160 00:07:59,189 --> 00:07:50,880 moog actuator systems were tested by 161 00:08:03,990 --> 00:08:01,430 marshall approved chrysler designs for 162 00:08:06,710 --> 00:08:04,000 the s-1b spyder beam and completed the 163 00:08:09,270 --> 00:08:06,720 50 design review of the 60-degree 164 00:08:11,670 --> 00:08:09,280 fairing and the conceptual design review 165 00:08:13,830 --> 00:08:11,680 of the gox line and diffuser 166 00:08:16,309 --> 00:08:13,840 the design associated with elements of 167 00:08:27,350 --> 00:08:16,319 the tail section is now approximately 168 00:08:32,709 --> 00:08:30,150 on november 8th msfc authorized 169 00:08:35,110 --> 00:08:32,719 rocketdyne to continue with design 170 00:08:38,310 --> 00:08:35,120 development and testing required to 171 00:08:40,469 --> 00:08:38,320 upgrade the h1 engine from 188 000 172 00:08:42,870 --> 00:08:40,479 pounds of thrust to two hundred thousand 173 00:08:44,870 --> 00:08:42,880 pounds of thrust the first production 174 00:08:49,430 --> 00:08:44,880 engines are scheduled to be acceptance 175 00:08:54,150 --> 00:08:51,910 at santa monica douglas finished welding 176 00:08:57,590 --> 00:08:54,160 studs to the hydrogen forward dome of 177 00:09:00,070 --> 00:08:57,600 the s4b hydrostatic test stage work on 178 00:09:03,030 --> 00:09:00,080 the dynamics test stage included bonding 179 00:09:05,590 --> 00:09:03,040 the honeycomb core to aft common dome 180 00:09:08,550 --> 00:09:05,600 welding of flanges and elbows to the aft 181 00:09:13,190 --> 00:09:08,560 locks dome subfittings and seal welding 182 00:09:17,750 --> 00:09:15,750 also the liquid hydrogen cylinder skins 183 00:09:20,389 --> 00:09:17,760 for this stage were milled for forming 184 00:09:23,030 --> 00:09:20,399 and welding but one skin was rejected 185 00:09:27,269 --> 00:09:23,040 due to several cracks a replacement has 186 00:09:32,230 --> 00:09:29,590 meanwhile work progressed on the all 187 00:09:34,310 --> 00:09:32,240 systems test stage the attach rings for 188 00:09:36,790 --> 00:09:34,320 the common domes were completed and 189 00:09:39,030 --> 00:09:36,800 welding operations are underway 190 00:09:44,070 --> 00:09:39,040 the common bulkhead is being welded for 191 00:09:49,509 --> 00:09:46,790 at douglas's beta complex at sacramento 192 00:09:51,430 --> 00:09:49,519 static firing site for s4b the 193 00:09:54,389 --> 00:09:51,440 superstructure for the battleship test 194 00:09:56,310 --> 00:09:54,399 stand beta 1 was completed following 195 00:09:59,030 --> 00:09:56,320 final assembly and installation of 196 00:10:03,430 --> 00:09:59,040 installation the battleship tank was 197 00:10:05,750 --> 00:10:03,440 placed in the beta 1 stand december 18th 198 00:10:08,389 --> 00:10:05,760 the beta complex block house is nearing 199 00:10:12,870 --> 00:10:10,790 at beta 3 the all systems test and 200 00:10:16,790 --> 00:10:12,880 superstructure and propellant tanks were 201 00:10:21,269 --> 00:10:19,030 rocketdyne has completed fabrication of 202 00:10:23,350 --> 00:10:21,279 the first j-2 production engine 203 00:10:25,509 --> 00:10:23,360 originally designed for cold flow 204 00:10:27,990 --> 00:10:25,519 testing delivery was made to santa 205 00:10:30,150 --> 00:10:28,000 monica in november after inspection and 206 00:10:31,670 --> 00:10:30,160 checkout the engine will be used in the 207 00:10:34,550 --> 00:10:31,680 engineering development systems 208 00:10:37,670 --> 00:10:34,560 integration laboratory 209 00:10:39,910 --> 00:10:37,680 activity at douglas's s4b mock-up area 210 00:10:41,990 --> 00:10:39,920 at santa monica included electrical 211 00:10:43,110 --> 00:10:42,000 component installation in the aft thrust 212 00:10:44,870 --> 00:10:43,120 structure 213 00:10:47,590 --> 00:10:44,880 aft skirt electrical paneling 214 00:10:50,630 --> 00:10:47,600 installation customer connect panels 215 00:10:52,069 --> 00:10:50,640 installation dac's mating area to the j2 216 00:10:55,190 --> 00:10:52,079 engine 217 00:10:59,350 --> 00:10:55,200 work on the instrumentation probe 218 00:11:01,990 --> 00:10:59,360 and forward dome instrumentation wiring 219 00:11:03,990 --> 00:11:02,000 the delta ii test stand at santa susana 220 00:11:06,470 --> 00:11:04,000 which affords a 500 second run 221 00:11:08,630 --> 00:11:06,480 capability for the j2 engine was 222 00:11:11,110 --> 00:11:08,640 activated november 9th and engine 223 00:11:19,910 --> 00:11:11,120 testing at both positions began late 224 00:11:25,030 --> 00:11:22,389 a major milestone in the j-2 engine 225 00:11:27,430 --> 00:11:25,040 program was achieved late in the quarter 226 00:11:30,389 --> 00:11:27,440 with two successful full-duration hot